What to Have Ready Before You Call a Custom Home Builder
If you own land in the San Antonio area or the Hill Country and you’re ready to build, the first call to a builder goes a lot further when you have a few things in hand. None of this is required to start the conversation, but each item answers a question that affects what you can build and what it will cost.
1. Your survey and plat
A current survey shows your property lines, easements and building setbacks. Those lines decide where the house, driveway and septic system can go. If you bought the lot recently, the survey is usually in your closing paperwork.
2. Your deed restrictions and HOA rules
Most gated communities and many rural subdivisions have rules about minimum square footage, exterior materials, roof types and how long you have to start building. Some require plans to be approved by an architectural committee before construction. Bring the documents; they shape the design from the first sketch.
3. What utilities reach the lot
Find out whether you have public water and sewer, or whether you’ll need a well and a septic system. It makes a real difference to the budget. On our homes, a septic system typically runs $16,000 to $18,000, and a well runs $40,000 to $70,000.
4. A sense of the land itself
Slope, rock, trees and drainage all affect foundation and site costs. You don’t need a report to call us. We walk the land with you during a free homesite evaluation and tell you what we see. We typically include $4,000 for lot clearing; heavily wooded lots can need more.
5. A realistic budget
Our custom homes range from $500,000 to $2.5 million, not including land. Knowing roughly where you want to land lets us point you to plans and finishes that fit, instead of designing something you’ll have to cut back later. See how our pricing works.
6. How you plan to pay for it
If you’ll use a construction loan, talk to a lender early. They’ll tell you what you can borrow and what they need from the builder. If you already own the lot outright, that often helps. See how financing a custom home works.
7. A rough idea of the house
Bedrooms, one story or two, a must-have room or two. Photos of homes you like are useful. You can also start from one of our floor plans and change it to fit your land.
8. Your timeline
Plan on about three months for design, 30 to 45 days for permitting, and 10 to 16 months of construction, depending on location. If you have a date in mind, tell us up front.
Ready to talk?
We build in Bexar, Comal, Kendall and Medina counties. Request a free homesite evaluation and we’ll walk your lot with you, or call 210-494-1722. We’ll call you back within one business day.